A column next to the scale: large screen, barcode reader, label printer and badge reader. Everything it takes to close a roll, and nothing else.

EDG Sistemi · Industrial Solutions · Production control

Every roll that comes off
weighs itself.
And tells its story.

weighing, labelling and production control for plastic film

The weight comes from the scale, the job from your ERP, the label prints itself. Nobody writes a number by hand, and by the end of the shift the day is already on record: how much was produced, how much was wasted and why.

9lines on a single screen, each with its own status
3taps to record waste: type, reason, weight
0installations on workstations: everything goes through the browser
1QR code on the label opens the roll's whole history

Weighing · labelling · reporting · Blazor · .NET 9 · SQL Server

What it is

The shop floor
that writes itself

SI.SCO PRODUZIONE lives at the machines and in the office. At the machine it weighs, labels and records waste; in the office it shows what is happening now and what happened yesterday. In between there is no paperwork.

01 The weight

Comes from the scale

The operator sets the roll down and waits for the stability signal: the system takes the weight itself, with the tare of core and packaging. If the scale fails the value can be typed, and it stays flagged as such.

  • gross
  • tare
  • net
02 The label

Prints itself

Unique code, barcode, job data, the customer EAN when required and a QR code that opens the roll's history. Six layouts, full or anonymous, in Italian or English.

  • Code 128
  • EAN-13
  • QR
03 Waste

With its cause

Type, source and reason are chosen in three taps, then it is weighed. No waste exists without a written reason, which is why at month end you know where it comes from.

  • type
  • reason
  • weight
04 The view

Every line together

One screen with all the lines: what they are doing, how fast, how much they are wasting, how far along the job is. You look from three metres away and you understand.

  • status
  • kg/h
  • progress
A column next to the scale: large screen, barcode reader, label printer and badge reader. Everything it takes to close a roll, and nothing else.

The line station

A column next to the scale: large screen, barcode reader, label printer and badge reader. Everything it takes to close a roll, and nothing else.

Data is born where the product is born

The weight is the scale's, the time is the clock's, the operator is the badge's. No manual step means no number anyone can argue with.

Nothing to dispute

From the job to the pallet

The life of a roll,
in four moments

Four gestures, always the same. Each one leaves a piece of data behind, and those pieces in a row become the history of the product: where it was born, who made it, what it weighs and where it went.

  1. The operator scans the barcode on the work sheet. The job comes from the ERP: customer, article, width, thickness, core, metres, number of rolls and notes. 01 the sheet is scanned

    The job opens

    The operator scans the barcode on the work sheet. The job comes from the ERP: customer, article, width, thickness, core, metres, number of rolls and notes.

  2. The weight appears large on the display. Once it is stable the system takes it by itself, with the tare of core and packaging: gross, tare, net. 02 the roll goes on the scale

    The roll goes on the scale

    The weight appears large on the display. Once it is stable the system takes it by itself, with the tare of core and packaging: gross, tare, net.

  3. Unique code, barcode, job data and, when the order calls for it, the EAN. The QR code is on there too, and it opens the roll's history on a phone. 03 the label comes out

    The label comes out

    Unique code, barcode, job data and, when the order calls for it, the EAN. The QR code is on there too, and it opens the roll's history on a phone.

  4. At the last roll foreseen the line stops by itself and waits for an authorised release. When the job is done it closes, and the line waits for the next work sheet. 04 off to the warehouse

    The job closes

    At the last roll foreseen the line stops by itself and waits for an authorised release. When the job is done it closes, and the line waits for the next work sheet.

Waste follows the same path

Type, source and reason in three taps, then the weight. Eleven types and the reasons your plant decides. Every piece of waste gets its own label.

The shift is recognised automatically

Every weighing knows which of the three bands it belongs to, and weekdays stay separate from holidays. That is what lets you compare crews without argument.

Four gestures, no forms

The minutes between one roll and the next, the hours of downtime, the reason behind a release, who corrected a weight: data that collects itself while the work goes on. Nobody fills anything in.

You work, you do not record

The thirty screens

Everything
that is in it

None of these screens is a drawing: they are the pages of the system, with sample data. Here is the index, for anyone who wants to see the rest.

At the machine

Six screens

The station with the large weight, the job detail, waste in three taps, the menu with ten tiles, reporting a stop and the changeover sheet.

  • weight
  • job
  • waste
  • menu
02

Line station

The weight large in the middle, gross, tare and net one under the other, and the four keys it takes to close a roll.

Line station
03

Job in progress

The job fields as they come from the management system, the progress in rolls and kilograms, the waste on that order.

Job in progress
04

Waste in three taps

Type, source and reason in large boxes; then the material goes on the scale and is weighed.

Waste in three taps
08

Station menu

Ten tiles, one per action: close order, reprint, manual weight, release, report a stop, line instructions.

Station menu
23

Report a stop

The cause and the duration in two taps: that time goes into the figures without anyone writing it down.

Report a stop
25

Line instructions

The format-change sheet with its drawings, on the screen the operator already has in front of them.

Line instructions

In the office

Twelve screens

Control room, operations, waste, jobs, dashboard, shifts and crews, downtime, year-on-year comparison, log, summaries, exports, system status.

  • archive
  • statistics
  • log
  • printing
01

Control room

The nine lines on one screen: status, job, kilograms per hour, rolls closed, waste and progress.

Control room
11

Dashboard

The figures for the day, the shift and the week, compared with the period before.

Dashboard
05

Operations carried out

One line per roll and a search on nine criteria: dates, station, operator, order, item, type.

Operations carried out
06

Production waste

The waste grid, the causes in order of weight and how they concentrate on each line.

Production waste
12

Jobs

The orders as they come from the management system and the detail of the one in progress, with what is left.

Jobs
13

Shifts and teams

The three shifts side by side, the teams and the waste of each band, with holidays kept apart.

Shifts and teams
24

Machine stops

Hours lost by cause, by line and by shift, and the average length of a stop.

Machine stops
28

Comparison and trend

Month by month, year on year, item by item: where production grows and where it falls.

Comparison and trend
17

Event log

Everything that changes a figure: corrected weights, releases, cancelled labels, with who and why.

Event log
27

Export and print

You choose what comes out, look at the preview and then print it or save it to Excel.

Export and print
15

System status

The devices on every station — scales, printers and readers — with the outcome of the last check.

System status
21

Release request

Who authorises it, why and how many extra rolls: the request and its history stay on record.

Release request

Configuration

Eight screens

Stations, labels and the six layouts, waste types and reasons, operators and badges, profiles and access, alerts and thresholds, automatic summaries.

  • stations
  • labels
  • operators
  • thresholds
10

Line stations

The nine stations and the settings of one of them: scale, printer, label templates, waste types enabled.

Line stations
07

Labels and printing

The label templates and a preview of how they come out of the printer, before going on the line.

Labels and printing
22

The sample labels

The six templates side by side, large enough to read: pack, EAN, plain, waste, bales, packaging.

The sample labels
29

Waste types

The eleven types and the company's own reasons, with a preview of what the operator will see.

Waste types
09

Production operators

Records, badge reading and what each of them may do, station by station.

Production operators
30

Access and profiles

The five profiles, the passwords, the badges and the last logins, with a lock after five tries.

Access and profiles
26

Alerts and thresholds

When the system has to speak up and to whom: line stopped, waste over the threshold, limit reached.

Alerts and thresholds
16

Reports by e-mail

The scheduled sendings, the recipients, and a manual send over any range of dates.

Reports by e-mail

Outside

Four screens

The history of a roll, the shift leader's tablet, the phone with the stop alert and the read-only customer portal.

  • traceability
  • tablet
  • phone
  • portal
14

The story of a roll

From the job to the delivery, line by line, with every correction and its reason.

The story of a roll
18

The supervisor's tablet

The nine lines in hand, the release requests to authorise with a badge, the stops to look at.

The supervisor's tablet
19

Phone

How the shift is going, the alert when a line stops, and the roll read with the QR code.

Phone
20

Customer portal

The job, read only, for whoever ordered it: rolls ready, weight, metres and expected delivery.

Customer portal

None of these screens is a drawing: they are the pages of the system, with sample data.

The shop floor does not stop at six in the evening, and neither does the system. Night shift weighings come in with their band, alerts find the shift leader on the phone, and the next morning the numbers are already there, without anyone switching on a computer.

Twenty-four hours

Even when
nobody is in the office

The shop floor does not stop at six in the evening, and neither does the system. Night shift weighings come in with their band, alerts find the shift leader on the phone, and the next morning the numbers are already there, without anyone switching on a computer.

From the QR code to the whole story

Every roll
tells its story

The code on the label is not only for printing. Scanned with a phone it opens the life of that roll: which job it comes from, which line made it, who made it, at what weight, whether anyone corrected it and where it ended up.

The story of a roll
InsideThe roll's historyJob opened, order opened on the line, weighed, labelled, put on the pallet, shipped. And every correction with its reason: the number never changes in silence.
Customer portal
OutsideThe customer portalAn address reserved to that job, read-only, no password. The customer sees how far along it is, the rolls already made with weight and metres, and the expected delivery.
every roll has its label
every roll has its label
the warehouse reads with a scanner
the warehouse reads with a scanner
and the badge always says who
and the badge always says who
No phone calls"how far along are we" is the question the portal removes, and with it the half hour a day it costs.
The weight is not up for debateit is the one from the line scale, the same one on the packing list that travels with the truck.
A return is closed in a minutescan the code and you know shift, operator, job and weight.
Your data stays yoursthe portal shows one job at a time and exposes nothing else.
Traceability is not an extra module: it is what remains when data is born in the right place

Nobody enters anything to make it possible. You weigh, you label, and the story is already written.

traceability as standard

How it is built, how you start

A system
that just opens

Nothing is installed on workstations: the system sits on the company server and opens in a browser, on the line as in the office, on the tablet and on the phone. Scales and printers connect to the stations; updates happen in one place.

Linesweight · label · badge
Officearchive · reports
Shop floortablet · phone
Portalthe customer, read-only
THE COMPANY SERVERSCALES · PRINTERS · ERP · SQL
  • no installationupdates in one place

Blazor on .NET 9 and SQL Server, the same technology as the other SI.SCO systems: no components to install machine by machine, no versions to keep in step.

Start-up

From the first visit to the first roll

  1. Surveylines, scales, printers, habits
  2. Configurationstations, labels, waste types, shifts
  3. Test on one lineweight, printing, reading, reports
  4. Traininghalf a day per shift
  5. Go liveone line at a time, on agreed days

You start with one line and carry on with the others: production never stops.

Start-up takes a few weeks. The scales, printers and readers are the ones on your floor; the link to the ERP is read-only, and nothing changes in the way jobs are created.

Security

Who did what

Five profiles, encrypted passwords, lockout after five attempts, badges you can switch off in a second. Every corrected weighing, every release and every cancelled label stays in the log, with its reason.

Requirements

What you need, no surprises

  • ServerWindows Server, even a machine you already have
  • DatabaseSQL Server, Express edition included
  • Workstationsan up-to-date browser, PC, tablet or phone
  • Linesone scale and one printer per station

Nothing exotic: a Windows machine, SQL Server and the shop floor network. Stations are added when they are needed, without rebuilding anything.

Your data stays with youdatabase on the company server, a nightly copy with a test restore and an alert if the copy fails.
Licence on the serverone licence for the plant: stations are not counted one by one.
access from outsideonly with a certificate, governed by permissions
0DAYS OF LINE DOWNTIME

Would you like to see them?

Every roll that comes off weighs itself. And tells its story.

The people on the line make four gestures, and that is all. Around them the shop floor writes itself: the control room, downtime that gets counted, the tablet, the customer portal and an archive you can open from anywhere.

16 pages · PDF · in five languages

every roll has its label
Let's talk

A live demonstration takes half an hour and is run on the lines you already have: no scales replaced, no production stopped.

Let's talk

Contact

Let's talk
about the shop floor.

What is weighed, what is labelled, what does not add up at the end of the day: that is the starting point, with a site visit, and it ends with a written proposal. No commitment before the proposal.

  1. 01
    A phone call or an e-mailYou describe the shop floor as it is today: machines, workstations, what you want to solve.
  2. 02
    The site visitWe look at the lines, the scales, the printers and the management system in use, together with the people who work with them.
  3. 03
    The written proposalWhat will be done, in which order, with which timing and costs. Work starts only after the agreement.
  • OfficesPalazzo Gecos · Via Arcora 110 · 80013 Casalnuovo di Napoli (NA)
  • Registered officeVia Miguel Cervantes de Saavedra 64 · 80133 Napoli
  • Phone081 028 2091
  • E-mailcommerciale@edgsistemi.it
  • HoursMonday – Friday · 9:00 – 18:00

The data is used only to answer the request. Privacy notice.